Construction, June 8

Art Domantay, carpenters, and volunteers continue to install the tube structure at the P.S.1 site

53_dscf1104-copy.jpg
 View from PS1     
53_dscn0043-copy.jpg
 Tube Forest     
53_dscf1130-copy.jpg
 View of PS1     
53_dscn0022-copy.jpg
 View from the top     
53_dscf1100-copy.jpg
 View from the ground     
53_dscf1126-copy.jpg
 View from the back wall     
53_dscf1090-copy.jpg
 Beans Tomatoes Radishes Volunteer     
53_dscn0041-copy.jpg
 View through a Daisy     
53_dscn0020-copy.jpg
 Installing the Solar Panels     
53_dscn0018-copy.jpg
 Installing the Solar Panels